• english
  • french
  • portuguese
  • spanish
  • russian
  • chinese
  • Follow DUX on Google Plus
  • Follow DUX on YouTube

DUX News and Events

CIM 2017 Convention, Montreal, Quebec, Canada

CIM 2017

DUX will be exhibiting at CIM 2017 Convention in Montreal, Quebec, Canada. Visit us at Booth 1205 at the Palais des Congrès de Montréal from April 30 to May 3, 2017.


DT-20T Concrete Haulers at Work 24/7 on the Channel Tunnel Rail Link Project

DT-20T

Quantity six DUX model DT-20T Concrete Haulers worked 24/7 on the Channel Tunnel Rail Link Project delivering concrete to a Gomaco Commander III Slip Form Concrete paver from a Davidson’s Compactor Batch Plant.

The units measured only 6'-6″ (1 980 mm) wide making it possible for them to pass each other over two moveable crossing bridges (ramps) that were strategically placed during the project.

The DUX DT-20T with 90° dumping angle emptied its 10.8 yd3 (8.3 m3) load of concrete into a large skid where a 13-ton excavator, with a shortened boom to work in the tight tunnel conditions, scooped the concrete out of the skid and dumped it into the hopper in front of the paver.

In addition to the DT-20T’s, a DUX P1-PC20 Personnel Carrier which transported up to 20 people as well as pulled the moveable ramps into strategic positions performed excellently contributing to the success of the CTRL Project built by Nishimatsu Cementation Skanska Joint venture for Project Manager Rail Link Engineering (led by Bechtel) and client, Union Railways.

Please select the following links for more info :

Quantity (3) brand NEW DUX DT-20T underground concrete haulers available

Video

At Work 24/7 on the CTRL

TTC Project covered in Tunnelling & Trenchless Construction

DUX Soft Ride Suspension

DUX Soft Ride Suspension

Designed to withstand the rigors of severe underground mining conditions and improve driving comfort, the innovative DUX Soft Ride Suspension System provides a comfortable ride at higher tramming speeds.